Warning: strtotime() [function.strtotime]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Europe/Berlin' for 'CEST/2.0/DST' instead in /home/H0918/recyval.com/libraries/joomla/utilities/date.php on line 56

Warning: date() [function.date]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Europe/Berlin' for 'CEST/2.0/DST' instead in /home/H0918/recyval.com/libraries/joomla/utilities/date.php on line 198

Warning: date() [function.date]: It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected 'Europe/Berlin' for 'CEST/2.0/DST' instead in /home/H0918/recyval.com/libraries/joomla/utilities/date.php on line 198
Latest realizations


Building of a new composting facility for CCCL in Matoury (Guyana)

Composting of grren-waste inside forced aerated tanks.

Capacity : 8 000 tons/year.
Start-up : january 2005.

 

Building of a new composting facility for SYMCO in Péage de Roussillon (38)

Composting of mud and green-waste inside forced aerated tanks.
Capacity : 9 000 tons/year. Start-up : june 2005.
 

Building of a new composting facility for SIVOM in SAUDRUNE in Cugnaux (31)

Composting of mud and green-waste inside forced aerated tanks.

Capacity : 25 000 tons/year.

 

Composting factory of SIVG in Saint Laurent du Pont (38)

Project management for a composting factory of mud and bark in moutain area.

Capacity: 1 800 tons/year.

Start-up : 2009.

 

Composting factory of SAN in l'Isle d'Abeau (38)

Facility for the composting of  mud from water processing, and of green waste.
Capacity : 15 000 tons/year. The approved process is composting through ventilated boxes.

Start-up : 2008.

 


Page 2 of 3